UNIVERSITY OF SOUTHERN CALIFORNIA
THE PROJECT
The project for USC involved a new engineering lab in the Vivian Hall of Engineering. The scope included preparation for new equipment that required specialty piping for medical gases and complex electrical work. The remodel was conducted in an occupied lab, making careful preparations essential in protecting sensitive equipment. A specialty rigging contractor was used to install high-tech lab equipment at exact rough-in locations.
HIGHLIGHTS
DON'T TAKE IT FROM US
Hear from companies who have already been able to bring their dream projects to life with our award winning team.